Built by Atlántica Mareas SCG
The Ría de Vigo tidal array turns the slow breathing of the estuary into steady power for the fishing towns along its shore. It was built to sit quietly with the rías ecosystem, not against it. Output rises and falls with the tide, and the pool tracks every cycle.
Oracle-verified scores
Credit quality
every oracle update is on-chain ↗verified 2h ago ↗
Green impact
every oracle update is on-chain ↗verified 2h ago ↗
Bond pricing
99+4Price
6.60%-0.50%Yield
Funding timeline
79% 1,180,000 raised of 1,500,000 goal
Funded from the pool
08 Dec 2025
$520,000
Turbine expansion funded
19 Feb 2026
$360,000
Milestone draw released
02 Apr 2026
$200,000
Funded from the pool
27 May 2026
$100,000
This project's contribution
Your return is shaped by every project the pool backs. This one carries a credit quality of 74 and a green impact of 88, both refreshed on-chain by the oracle.
How is this calculated?
expected return = investment × (credit + green) ÷ 200 — read it in the contract ↗
You invest in the shared pool, which funds this project alongside others — not a per-project checkout.
Bond pricing
Oracle-verified observations, Jan 2026 – Jun 2026.
Price98.90% of par+3.70 since Jan 2026
Yield6.60%−0.50pp since Jan 2026